
Client: Surbana Jurong (SJ)
Location: AIA Tower, North Point, Hong Kong
Size: 11,000 sq ft
Programme: 6-week design and build
Scope: Strategy, interior architecture, MEP coordination, technology integration, furniture and ergonomics, biophilia, construction management, testing & commissioning
Executive Summary
Surbana Jurong engaged MJPM to deliver a fast-track office design and construction project within AIA Tower in North Point. The brief called for a collaborative, behaviour-led workplace that could support hybrid teaming, showcase SJ’s global brand, and improve employee wellbeing. In just six weeks, MJPM completed a full turnkey delivery covering concept design, technical documentation, approvals, build, technology deployment, and move-in.
Key outcomes include:
• A cohesive design direction that blends SJ’s urban-infrastructure expertise with warm, natural finishes.
• 110 height-adjustable desks (HADs) deployed across neighbourhoods to enable posture variation and inclusive ergonomics.
• Rich biophilic design strategies—natural materials, potted and integrated planting, and daylight-friendly planning—to improve comfort and cognitive performance.
• A collaborative, behaviour-led floor plan with a spectrum of focus, co-creation, and community settings calibrated to actual work patterns.
• Highest-level technology integration across AV, UC, networking, room booking, occupancy sensing, and digital wayfinding.
• Delivered on time and on budget in a live commercial tower with rigorous stakeholder and landlord coordination.
Why AIA Tower, North Point?
AIA Tower is a Grade-A office building in North Point, chosen for its transport connectivity, building services reliability, and professional image. The site had to accommodate a dense headcount while providing an open, client-facing environment and resilient infrastructure for design teams who collaborate across time zones.
Project Ambitions
Deliver in six weeks without compromising quality, safety, or compliance.
Design Direction
Concept: “Nature-in-the-City”
The creative direction juxtaposes SJ’s infrastructure DNA with materials and forms inspired by nature. A restrained palette—timber tones, matte black metalwork, mineral-effect surfaces, and textured fabrics—creates a calm backdrop for focused work. Strategic injections of greenery and daylight-oriented planning counterbalance the dense programme typical of Hong Kong.
Spatial Moves
• Reception & Showcase Spine: The arrival sequence fronts a linear “spine” that connects reception, client lounge, and meeting suites. Timber slats and integrated planting lead the eye through the space while concealing services and improving acoustics.
• Neighbourhoods: The open office is divided into team “neighbourhoods,” each with HAD clusters, enclosed focus rooms, and touchdown benches. This reduces cross-floor travel, supports team identity, and shortens feedback loops.
• Collaboration Gradient: Spaces are arranged from low-energy (quiet focus) to high-energy (project rooms, café-style collaboration) to minimise noise conflicts and make wayfinding intuitive.
• Materiality & Light: Warm wood veneers, stone-look surfaces, and woven textiles punctuate a neutral base. Glazing and internal windows maximise borrowed light, while perforated features, acoustic ceilings, and soft panels tame reverberation.

Planting Strategy
Biophilia is treated as a performance layer, not decoration. We used a blend of live planting (low-maintenance species selected for indoor tolerance) and integrated planters on storage credenzas and collaboration zones. The effect:
• Visual connection to nature across long sightlines.
• Micro-zoning of open areas, subtly separating circulation from heads-down work.
• Acoustic attenuation, with foliage breaking up sound reflections.
• Air quality support, complementing the building’s mechanical systems.
Natural Cues in Finishes
Organic textures and tactility—ribbed timber, felt-backed acoustic panels, and mineral-finish laminates—invite touch and soften the corporate feel, making the environment more human-centred.
Workpoint Philosophy
Every assigned workstation is an HAD to promote movement and posture variation. This universal approach avoids a two-tier system and normalises ergonomic best practices.
Ergonomic Package
• Height-adjustable desks with three memory presets and anti-collision safety.
• Monitor arms with full articulation to maintain neutral neck posture.
• Adjustable task chairs supporting lumbar variability and dynamic sitting.
• Footrests and cable management to keep sit-stand transitions snag-free.
• Personal task lighting with high colour rendering for reduced eye strain.
Wellbeing Benefits
Teams can switch from sit to stand during long coordination calls or design reviews, improving circulation and alertness. Ergonomics training and quick-start desk guides help embed the behaviours from day one.
How We Mapped Behaviour
We started with leadership interviews and team workshops to profile activity types: focused design, peer reviews, vendor coordination, multi-disciplinary workshops, and client meetings. We then translated this into a planning ratio across the following settings:
• Focus Rooms & Quiet Booths for individual concentration or calls.
• Huddle Rooms (2–4 people) for quick problem solving.
• Project Rooms with writable walls and pin-up surfaces for iterative design.
• Hybrid Meeting Rooms with video-first layouts to equalise in-room and remote participants.
• Open Collaboration Zones (soft seating and high benches) for informal exchanges.
• Café & Social Hub for community rituals, town halls, and workshops.
• Custom Material Library for B+H and Chill
Given the client’s strong in-house design capability, we created a dedicated material library to streamline sampling, specification, and design reviews.
The Result is a floor plate that absorbs real-world behaviour—reducing the temptation to over-book boardrooms and enabling faster decisions in the flow of work.

To make collaboration effortless, we executed a comprehensive technology stack during the office design and construction phase, fully coordinated with MEP and architectural details.
Unified Communications & AV
• Video-first rooms tuned for Teams/Zoom with intelligent cameras, beamforming mics, and echo-managed DSP.
• Single-touch join and signage outside each room showing live availability.
• Wireless presentation for cable-free sharing from laptops and mobile devices.
• Acoustic treatments and sightline-based furniture layouts to keep every participant engaged.
Network & Infrastructure
• CAT6A structured cabling backbone with PoE for endpoints like WAPs, phones, and sensors.
• Wi-Fi heat-mapping to guarantee even coverage across open office and meeting suites.
• Server/IT room rationalised with efficient rack layouts, UPS, and environmental monitoring.
Smart Workplace Layer
• Room-booking integrated with calendars to cut no-shows and improve utilisation.
• Occupancy sensors feeding analytics on peak/valley usage to refine cleaning cycles and space planning.
• Digital wayfinding and signage to help visitors navigate the meeting suite easily.
This integration ensures that technology recedes into the background—fast, reliable, and intuitive, not fussy.
Pre-Start & Approvals
Given the compressed timeline, we ran design and construction in parallel, aligning closely with AIA Tower management for permits and building rules. Long-lead items were identified early; alternatives were pre-approved to maintain quality without risking schedule.
Programme Highlights
1. Weeks 1–2:
o Selective strip-out and services verification.
o Partition framing; MEP rough-in; server-room containment.
o AV cabling and bracketry laid in tandem with ceilings.
2. Weeks 3–4:
o Board and tape; glass fronts and doors; joinery shop drawings locked.
o Painting; floor finishes staged by zone; planting plan finalised.
o Endpoint installation begins: lighting, WAPs, sensors, access control.
3. Weeks 5–6:
o 110 HADs delivered and installed; chair and monitor arm fit-out.
o AV hardware commissioning; system handoff and training.
o Testing & commissioning for MEP; deep clean; move-in support.
Work hours and noisy tasks were coordinated to minimise disruption to neighbouring tenants. Materials lifted during approved windows; waste managed to the tower’s standards. Daily safety briefs and QA walk-throughs ensured the site met AIA Tower’s compliance requirements.

• Ergonomics at scale via HADs reduces sedentary time and supports diverse body types.
• LED lighting with smart controls and daylight-aware zoning to cut energy while maintaining comfort.
• Low-VOC finishes and adhesives to support indoor air quality.
• Biophilic elements and acoustic softening to mitigate stress and cognitive fatigue.
• Flexible planning so rooms can be re-tuned (furniture and tech) rather than rebuilt, extending the fit-out’s useful life.
• Design–Cost–Time Triangulation: Options matrices during early design balanced aesthetics, performance, and availability.
• Mock-ups & Samples: We pre-built a typical workpoint and a huddle room AV rig to validate ergonomics and UX.
• Change Control: A simple RFI/VO log with transparent impact notes let the client make fast, informed decisions.
• Handover Package: As-builts, equipment schedules, warranties, and training videos were delivered at completion for smooth facilities management.
• On-time delivery in six weeks with zero safety incidents.
• Improved utilisation of meeting spaces due to room-type right-sizing and booking analytics.
• Positive employee feedback on comfort and posture flexibility with the 110 height-adjustable desks.
• Higher collaboration quality reported in hybrid meetings thanks to consistent AV performance and acoustics.
• Brand coherence in client-facing areas, aligning the workplace with SJ’s reputation for resilient, human-centred infrastructure.
1. Speed without compromise: A full office design and construction programme in a Grade-A tower, executed in six weeks, required disciplined sequencing and early vendor alignment.
2. Ergonomics at scale: Many workplaces offer sit-stand selectively; SJ standardised it for 110 seats, embedding wellbeing into everyday work.
3. Behaviour-led planning: The layout mirrors how teams actually collaborate, not just where they sit.
4. Technology that disappears: The highest level of integration feels simple—because the complexity is carefully engineered behind the scenes.
5. Biophilia with purpose: Planting and natural materials are tuned for sightlines, acoustics, and micro-zoning, not only aesthetics.
• Front-load coordination with building management on lifts, noisy works, and after-hours access; this pays dividends in schedule certainty.
• Lock the technology brief early, especially network density and AV specifications, so ceilings and joinery can be fabricated in parallel.
• Standardise ergonomic packages for consistency in training and maintenance.
• Treat biophilia as a system, with maintenance plans and irrigation where practical.
The project was delivered with minimal punch-list items and a clean commissioning handover. Team leads highlighted the seamless hybrid meeting experience, the comfort of sit-stand work, and the calm yet professional aesthetic that fits the AIA Tower context. Glowing client testimonial can be viewed here
This AIA Tower, North Point project demonstrates how a behaviour-led approach to office design and construction can translate into everyday performance. By aligning strategy, ergonomics (110 height-adjustable desks), biophilia, and highest-level technology integration, MJPM delivered a workplace that is flexible, resilient, and distinctly human. Most importantly, it was delivered in six weeks, proving that speed and quality can coexist when design intent, engineering, and site management are integrated from day one.
At a Glance
• Building: AIA Tower, North Point, Hong Kong
• Area: 11,000 sq ft
• Duration: 6 weeks (design & build)
• Highlights: Behaviour-led planning, 110 HADs, biophilia, hybrid-ready collaboration, enterprise-grade AV/IT
• Services: Strategy, interior design, MEP/IT coordination, construction, technology integration, commissioning
