Before committing to an office lease, establish whether the specific unit can support your business, what work it needs and who will take responsibility for that work. A successful viewing should leave you with evidence and actions, rather than a general impression that the premises look ready.
This office rental checklist is designed for the pre-lease stage. Use it to organise information from the landlord, building management, your fit-out team and specialist advisers. The aim is to resolve material questions while you can still compare premises and negotiate the handover terms.
Complete a short intake brief before the visit:
Identify requirements that would rule out a property if they cannot be met. These might include reliable after-hours cooling, confidential meeting rooms or a feasible installation route for essential connectivity.
Keep three kinds of evidence distinct: what you observed, what documents state and what a competent specialist has verified. Mark inaccessible areas and untested systems as unresolved.
A viewing identifies visible concerns. A fit-out feasibility review assesses the proposed layout, service requirements and delivery constraints. Formal technical due diligence requires an agreed professional scope; legal review addresses the lease and negotiated protections. This checklist helps coordinate those inputs and does not provide statutory certification or clearance to occupy.
Ask the landlord or building management for available documents covering:
Ask which drawings reflect the current premises. Missing records should generate a follow-up action, especially where later alterations are visible.
The fit-out manual should also clarify permitted work hours, noisy-work restrictions, nominated-contractor requirements, deposits, protection of common areas and delivery arrangements. Establish who can authorise specialist access to plant, service risers and concealed areas. An ordinary viewing should not involve opening electrical enclosures or disturbing ceilings, finishes or services.

Copy the checklist for each shortlisted unit. In the last column, record the status, a named action owner and the next step. Use Confirmed, Verify, Agree or Unsuitable; record supporting evidence separately.
| Check | Evidence To Obtain | Confirm With | Status And Next Action |
| Use And Layout | Use records, measured plan, test fit, heavy-equipment details | Design team; relevant building professional; solicitor | _____ |
| Power | Approved loading, drawings, relevant certificates, demand assessment | Registered electrical contractor; building management | _____ |
| Cooling And Fresh Air | Service hours, after-hours terms, maintenance records, layout review | Building management; building-services specialist | _____ |
| Internet And IT | Exact-unit carrier response, route/access requirements, cabling records | Carrier; IT team; building management | _____ |
| Fire Services And Alterations | Maintenance records, existing layout, proposed-work requirements | Building professional; registered fire-service installation contractor | _____ |
| Fabric, Water And Acoustics | Dated photographs, repair history, observations and required assessments | Landlord; relevant specialists | _____ |
| Fit-Out Access | Fit-out manual, work windows, delivery route and lift restrictions | Building management; fit-out team | _____ |
| Handover And Lease-End Works | Inventory, agreed repairs, condition record, written obligations | Landlord; fit-out team; solicitor | _____ |
Describe the actual activities planned for the premises. Training sessions, studio work, frequent public visits or specialist equipment can raise different questions from a conventional administrative office. Have the relevant advisers check the applicable building, planning and lease constraints rather than relying on the property’s marketing description.
Prepare a measured test fit showing desks, meeting rooms, storage, support areas and circulation. Check columns, entrances, clear heights and existing sanitary and pantry locations. Include accessibility needs and routes between the entrance and the working areas.
Clarify the area basis used in the letting particulars. The quoted area alone does not demonstrate how many people or rooms can fit usefully into the available floor plate.
Flag dense filing, compact storage, safes, server racks and other heavy equipment for load assessment. Provide the proposed weights and locations to the relevant professional. Do not infer safe floor loading from the previous tenant’s furniture or from an apparently solid floor.
Decision To Record: Can the required activities and layout be accommodated, and which changes need further assessment or permission?
Give a registered electrical contractor your equipment schedule, including IT, AV, pantry appliances and any supplementary cooling. Ask for an assessment of demand against the approved loading, supply arrangement and distribution within the unit. Outlet locations and circuit arrangements matter alongside total capacity.
Request meter information, drawings, circuit schedules and relevant electrical certificates. For each record, check the address, covered installation, date and subsequent alterations.
EMSD’s guidance on electrical inspection and certification distinguishes two important records:
Ask the contractor which requirements apply. A certificate for communal services does not automatically cover the tenant’s installation, and an existing certificate does not establish that the proposed equipment demand can be supported.
Where more capacity is needed, obtain a supported upgrade proposal covering building and utility requirements, permissions, cost and programme. Keep an unconfirmed upgrade open in the decision record. Leave enclosure access, testing and electrical work to the appropriate registered professionals.
Decision To Record: Is the proposed demand supported, or is occupation dependent on a defined electrical upgrade?
Obtain the building’s normal air-conditioning hours in writing. Ask separately about evenings, weekends and public holidays, including booking notice, minimum booking periods, availability and charges. Confirm access hours too: permission to enter the building does not establish that cooling will be operating.
For equipment running outside normal office hours, establish a feasible cooling arrangement. If supplementary equipment is proposed, check the required power, plant location, drainage, maintenance access and permissions before including it in the budget.
Have the building-services specialist review cooling zones, controls, fresh-air provision and return-air paths against the intended layout and occupancy. A meeting room created inside an open office may need service changes even when the surrounding space feels comfortable.
During the visit, record odours, condensation, staining, leaks and unusual plant noise. Ask for maintenance and available performance records. A short viewing cannot establish how the office performs when fully occupied or under different weather conditions.
If an indoor air quality certificate is supplied, check its date and the areas covered. Hong Kong’s IAQ Certification Scheme For Offices And Public Places is voluntary. The absence of a certificate is not automatically a legal breach; a certificate covering another area or an earlier configuration may not answer questions about your unit.
Decision To Record: Can the unit maintain suitable conditions for the intended occupancy, equipment and working hours?

Give the intended carrier the complete building address, floor and unit, together with the service required. Ask for confirmation of availability, the proposed lead-in route, telecommunications-riser access, installation prerequisites and the basis of the proposed activation date.
Keep the carrier’s response alongside building management’s access requirements. Record who must arrange each permission or appointment. Building-level fibre availability and an existing wall outlet do not establish that your business service can be activated on schedule.
Have the IT team assess inherited cabling, labels, patch panels, racks and available test records. Confirm equipment ownership and any licence or service-transfer conditions. The incoming team should control the secure commissioning of retained devices.
Where continuity requires a backup service, investigate shared routes and dependencies with the providers. Include local-network, Wi-Fi and video-meeting requirements in the review rather than judging the whole workplace by the advertised broadband speed.
Decision To Record: Is there a credible route to a working service by the operational date, with outstanding dependencies assigned?
Record visible escape routes, doors, exit signs, obstructions and fire-service equipment. Mark proposed partitions, ceilings and storage on the plan so the appropriate building professional and registered fire-service installation contractor can assess their effects. Do not operate alarms or interfere with installations during the viewing.
Request maintenance and inspection records covering the relevant installations, and establish who owns and maintains them. The Fire Services Department’s fire-safety guidance explains the owner’s duty to keep fire-service installations and equipment in efficient working order and arrange registered-contractor inspection at least every 12 months.
A Certificate Of Fire Service Installations And Equipment, commonly called F.S.251, relates to the work or inspection it records. It should not be treated as blanket approval of the office layout or the entire fit-out. Changes to fire-service layouts may require additional documentation.
Treat landlord consent and statutory compliance as separate requirements. The Buildings Department’s alterations and additions guidance explains why the applicable route depends on the work, including whether designated minor-works procedures apply. Have the relevant professional identify the requirements for the actual proposal before fixing the construction programme.
Decision To Record: Which existing concerns and proposed alterations need action, and who is responsible for each approval or submission?
Photograph visible cracks, damaged finishes, window defects, floor irregularities and water staining, noting the exact location and date. Request leak and repair history. A stain may need investigation even if someone has recently repainted the surrounding surface; visual appearance alone does not establish the cause or successful repair.
For pantry or drainage changes, establish feasible connection routes and permissions. Record inaccessible areas rather than assuming they are sound.
Assess noise during representative building activity where possible. Note neighbouring conversations, external noise and plant noise, and identify rooms intended for confidential discussions. Where privacy is important, obtain appropriate acoustic assessment. A quiet viewing or an informal listening check provides limited evidence of how the completed workplace will perform.
Finally, trace the delivery route from the loading bay to the unit. Check goods-lift door and car dimensions, load restrictions, booking arrangements, corridor turns and delivery windows against the furniture and equipment you intend to install. Include access for later maintenance and replacement.
Decision To Record: Which defects, acoustic shortcomings or access restrictions change the repair scope, design or delivery plan?
For every material unresolved item, record the evidence needed, named action owner, decision deadline and effect on cost or occupation. Distinguish the party supplying information from the party carrying out or paying for the work.
Agree a handover schedule covering retained items, known defects, promised repairs, required records and how completion will be checked. Set out repair and maintenance responsibilities in the agreed office-lease terms. The Rating and Valuation Department’s guidance on repair liabilities explains the limits of the repair-liability provisions in the Landlord and Tenant (Consolidation) Ordinance.
Clarify lease-end reinstatement at the same time, including obligations affecting inherited installations. Identifying the likely office reinstatement works early helps establish their place in the occupancy budget. Have your solicitor review the lease and incorporate agreed responsibilities and any necessary protections into the appropriate documents. Photographs and a checklist do not, by themselves, change the lease.
These are business decision stages, not safety certificates. Where an unresolved issue could prevent occupation, seek advice on resolving it before committing.
At possession, compare the actual premises with the agreed inventory, condition record and repair schedule. Record changes and outstanding items promptly.
After fit-out, obtain the completion records, test and commissioning results, as-built drawings and operating information appropriate to the works. Pre-lease checks help you assess feasibility; handover and post-works checks record what was actually delivered.
Bring the floor plan, handover specification, fit-out manual and workplace requirements to MJPM’s office fit-out project management team. Agree a scope for reviewing layout feasibility, service interfaces and delivery constraints, including any separately required specialist inspections or testing. The useful outcome is a clear list of what the premises can support, what needs work and what must be settled before the lease decision. Contact MJPM now.